MSEL

Lambda To CAN - Dual (LTCD) Long Lead

SKU: MOT61301L

Product image 1

Description:

Motec Dual Lambda To CAN (LTCD) long lead for use with Bosch 4.9 sensors.

Connects to any Motec CAN compatible product through CAN-bus.

Please note that a lambda sensor is not included with this price.

 

Accessories (sold separately)